CM Omar inaugurates multiple projects in Ganderbal, lays foundation stones worth ₹58.26 crores

Reviews Ring Road, Sindh River Front and Town Hall projects; interacts with fruit growers at Zazuna Mandi

Convener News Desk


Ganderbal, Oct 15: Chief Minister Omar Abdullah today reviewed the overall development scenario in Ganderbal district, inaugurated five completed development projects worth ₹16.72 crore and laid foundation stones for two new projects worth ₹41.54 crore, taking the total value of the projects to ₹58.26 crore.

The projects include improved road connectivity, a new school building, a bridge over the River Jhelum and a multi-purpose auction platform at the Fruit and Vegetable Mandi, Zazuna, aimed at strengthening public infrastructure and supporting the district’s horticulture economy.

The Chief Minister laid the foundation stone for the construction of a bridge over the River Jhelum at Guzhama Shilwat at a cost of ₹39 crore. The bridge is expected to improve connectivity for local residents. He also laid the foundation stone for a multi-purpose auction platform at the Fruit and Vegetable Mandi, Zazna, at a cost of ₹2.54 crore to strengthen trading facilities for fruit and vegetable growers.

The Chief Minister inaugurated five completed projects, including roads connecting Tehsil Bagh with Lar Bypass and Yanihama with Dangerpora; the road from Dar Mohalla Wattalbagh to Dangerpora and allied links; the double-storey building at High School Gogjigund; the widened and upgraded road from Fatehpora Dak Bangloo to Gadoora Bridge; and the Pati Waskura to Kharbagh Bund road along the River Jhelum. These works, completed at a combined cost of ₹16.72 crore, are expected to improve local connectivity and educational infrastructure.

During the tour, the Chief Minister reviewed the progress of the Srinagar Ring Road project and was briefed by engineers at Dr Farooq Abdullah Environmental Park, Manigam, on the ongoing construction and upgradation of the Pandaach-Manigam section.

The 12.115-kilometre highway project, being executed by the National Highways Authority of India at a cost of ₹290.51 crore, involves upgrading the existing two-lane road to a four-lane dual carriageway. The project includes bridges, a flyover, culverts and service and slip roads, and is scheduled for completion by May 2028.

The Chief Minister also reviewed ongoing works on the Sindh River Front and the Municipal Town Hall in Ganderbal. The first phase of the Sindh River Front project, being developed at an approved cost of ₹4.83 crore, includes a protection wall, landscaping, a paved walkway, a viewpoint, a patio café and ornamental lighting.

Reviewing the Town Hall upgrade and extension project, approved at a cost of ₹3 crore, the Chief Minister directed the concerned officers to expedite the works and ensure their early completion so that the facilities could be made available to the public at the earliest.

During his visit to the Fruit and Vegetable Mandi at Zazuna, the Chief Minister assessed arrangements and activities during the ongoing harvest season and interacted with farmers and progressive growers. The growers apprised him of issues affecting their work and the horticulture sector. Omar Abdullah assured them that their genuine demands would be taken up for appropriate resolution.

The Chief Minister’s visit focused on reviewing ongoing infrastructure projects, assessing the implementation of development works and addressing issues raised by local residents and growers.

Deputy Chief Minister Surinder Kumar Choudhary, Ministers Sakina Itoo and Javid Dar, Advisor to the Chief Minister Nasir Aslam Wani, Additional Chief Secretary to the Chief Minister Dheeraj Gupta, Deputy Commissioner Ganderbal Shreya Singhal, along with senior officers, heads of departments, engineers and other concerned officials, accompanied the Chief Minister during the tour.

Comments are closed.